Local news for Norwich

Norwich City Hall refurbishment plans go to planners

The council wants to open more of the listed building to the public. Residents can see and comment on two applications.

Nov 11, 2026
Norwich City Hall refurbishment plans go to planners

Archive photo: Norwich - City Hall © Colin Smith / Geograph. Banner added by Norwich Pulse. CC BY-SA 2.0.

Norwich City Council has submitted plans to refurbish City Hall, with more space for the public and repairs to the clock tower. The council announced the submission on Tuesday 10 November. The planning register lists the two applications, for planning permission and listed building consent, as awaiting decision.

The proposals would change what visitors find when they walk through the front doors on St Peters Street. The council wants to reorganise the entrance and lobby and create a public room for community use. Its earlier consultation described a space that could host exhibitions, talks and meetings.

What the applications cover

One of the biggest changes would be to roof over the north lightwell, creating an atrium inside the building. The plans also cover repairs to roofs and windows, changes to workspaces and restoration of the council chamber. The council says it wants to make the clock tower more accessible.

The building is Grade II* listed. The parallel consent application sets out changes to its fabric as well as internal works. The council’s September consultation said that separate access work had already begun under an earlier consent, including a ramp, a lift and accessible toilets.

How to see the plans and comment

Open the planning application 26/01093/F or the listed building application 26/01094/L. Both cases are listed at City Hall, St Peters Street. Their Documents tabs hold the plans and supporting statements, and the Comments tabs show how to respond.

The September survey has closed. The council says it has drawn on two rounds of feedback in shaping the submission. It reports that the atrium drew the strongest support in the latest round, with 68% of respondents positive about it.

The council expects the proposals to reach its planning committee in the second half of 2027. Its consultation material said that decisions about the building’s future use and funding would follow the outcome of local government reorganisation. The current applications are an opportunity to examine the design while those wider decisions are still ahead.

0 Comments

Join the conversation

Be the first to comment

Share your thoughts above.

More from Norwich Pulse