
Passengers travelling between Norwich and Peterborough should plan for replacement buses on Saturday 31 October and Sunday 1 November because of engineering work. East Midlands Railway’s weekend service notice says no EMR trains will run between the two cities. Its direct buses will not call at intermediate stations. That distinction matters if your destination is between Norwich and Peterborough: EMR directs those passengers to other companies’ services, rather than to its non-stop replacement bus. Changes around Ely and Cambridge NorthNational Rail confirms that the work is between Peterborough and Cambridge North, closing lines via Ely. Greater Anglia replacement buses are listed between Peterborough and Ely, and between Ely and Cambridge North. CrossCountry buses between Peterborough and Cambridge will call at Ely and March, with Whittlesea and Manea served on Saturday only. Great Northern also has replacement buses between King’s Lynn and Cambridge North. Network Rail’s autumn travel information says Greater Anglia trains will continue between Norwich and Ely and between Cambridge North and Stansted Airport/London. That should not be read as an unchanged through journey across the works: check each leg and connection. Check your actual departureUse the date-specific National Rail disruption notice and journey planner before setting out. Allow extra time and check where the replacement vehicle leaves your station. The notice advises checking station signage or station information for pickup points. Anyone needing accessible travel arrangements or carrying a bicycle should check the replacement-service guidance for their journey, rather than assuming a bus has the same facilities as a train. These arrangements apply to the 31 October–1 November weekend. They are separate from the city bus diversions and earlier October rail works. |






0 Comments
Join the conversation
Be the first to comment
Share your thoughts above.